10 August 2010, 20:00

Reconstruction of Baksan HPP in Kabardino-Balkaria will be over in 2.5 years

The "Caucasian Knot" correspondent was informed at the press service of the Kabardino-Balkarian Branch of the Open Joint-Stock Company (OJSC) "RusHydro" that the full reconstruction of the Baksan Hydroelectric Power Plant (HPP) in Kabardino-Balkaria will be carried out during 2-2.5 years.

Now, the HPP is under the round-the-clock 3-shift repairs, the press service spokesperson said and added that a video monitoring system will be installed to improve safety.

According to Magomet Beppaev, deputy dead of the construction directorate of the above "RusHydro", after the events at the Baksan HPP the security staff was increased, same as the height of the protection fence (with addition of barbed wire); additionally, special sliding automatic barriers will be installed at the entrances to the HPP.

Author: Louisa Orazaeva Source: CK correspondent

All news
НАСТОЯЩИЙ МАТЕРИАЛ (ИНФОРМАЦИЯ) ПРОИЗВЕДЕН И РАСПРОСТРАНЕН ИНОСТРАННЫМ АГЕНТОМ ООО “МЕМО”, ЛИБО КАСАЕТСЯ ДЕЯТЕЛЬНОСТИ ИНОСТРАННОГО АГЕНТА ООО “МЕМО”.

November 14, 2024 23:18

November 14, 2024 22:45

November 14, 2024 22:40

  • Kuban resident fined for pacifist post on Telegram

    The court has fined Anton Timoshenko, a resident of the Pavlovsky District of Kuban (the Krasnodar Territory), for a pacifist video placed by him in a Telegram channel criticizing the special military operation (SMO) in Ukraine.

November 14, 2024 19:39

November 13, 2024 23:56

News archive